08/12/08
2008 ROAD WORK NOTICE
Each year The Sea Ranch Association applies slurry seal to approximately one-fifth of the roads in The Sea Ranch. This treatment has proven to be a cost effective method of maintaining Sea Ranch roads. Unfortunately, it requires road closures that might inconvenience you.
This year the road work is scheduled for: Monday, September 8th through Thursday, September 11th. This means that scheduling of service installations and service calls will be limited to accessible areas during that time.
September is also going to be a very busy month for Central Valley Cable plant construction. We will begin major plant construction on September 10th that may last up to 2-4 weeks. Service installations will be kept to a minimum during this time, but we will tend to outages and trouble calls as they come in.
Please refer to the list below for dates and locations of The Sea Ranch Road Work Closures:
MONDAY, SEPTEMBER 8
Ballast
Broad Reach
Halcyon (west of Hwy 1)
Leeward Road (Halcyon to north end)
Main Sail
Mizzen Mast
Forecastle
TUESDAY, SEPTEMBER 9
Buckeye
Equinox
Fish Rock
Hatchway
Helm
Leeward Road (between Helm & Halcyon)
Rock Cod
Sea Lion
Sea Stack
Windrow
WEDNESDAY, SEPTEMBER 10
Burl Tree
Del Mar Point
Klamath
Leeward Road (South Wind to Helm)
Solstice
Starboard
Tallgrass
Windsweep
Del Mar Tennis Court parking lot
THURSDAY, SEPTEMBER 11
Back Pack
Deer Trail
Foremast
Grey Whale
Heron
Leeward Road (Back Pack to South Wind)
Pelican
Sea Drift
South Wind
Tide Pool
Del Mar Center & Pool parking lots
As always, please feel free to call Central Valley Cable about your cable or internet needs, and contintinue to check back for updated information.
"Great Things Are Coming Your Way"
![]()